|
|
|
Courses taught
Post-graduate Courses: Supply chain planning & Optimization,
Logistics Systems Analysis, Uncertainty Programming, and Multi-criteria decision making (MCDM).
Undergraduate Courses: Production Planning & Scheduling, Inventory control, Work study, Facility planning, Statistical Quality Control, |
---|
Books/Book chapters
10. Sahebjamnia, N., Torabi, S.A.,
Mansouri, S.A., (2015), Integrated business continuity and disaster recovery planning: Towards organizational resilience,
European Journal of Operational Research, 242(1), 261–273.
11. Salehi, N., Torabi, S.A., Sahebjamnia, N., (2015). Retail supply chain network design under operational and disruption risks, Transportation Research Part E, 75, 95–114.
12. Torabi, S.A., Baghersad, M., (2015),
Resilient supplier selection and order lot-sizing under operational and disruption risks,
Transportation Research Part E: Logistics and Transportation Review, 79, 22–48.
13. Torabi, S.A., Hassini, E. and Jeihoonian, M., (2015), Fulfillment source allocation, inventory transshipment and customer order transfer in e-tailing,
Transportation Research Part E: Logistics and Transportation Review, 79, 128–144.
14. Mousazadeh, M.,
Torabi, S.A., Zahiri, B., (2015), A robust possibilistic programming approach for pharmaceutical supply chain network design, Computers and Chemical Engineering, 82, 115–128.
15. Zahiri, B., Torabi, S.A., Mousazadeh,
M., (2015), Blood collection management: Methodology and application,
Applied Mathematical Modeling, 39, 7680-7696.
16. Hatefi, S.M., Jolai, F.,
Torabi, S. A., (2015), A credibility-constrained programming for reliable forward–reverse logistics network design under uncertainty and facility disruptions,
International Journal of Computer Integrated Manufacturing, 28(6), 664-678.
17. Ghasemy Yaghin, R., Fatemi Ghomi, S.M.T., Torabi, S.A., (2015), A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration,
International Journal of Systems Science, 46(14), 2628-2639.
18. Mohammadi, M., Torabi, S.A., Tavakkoli-Moghaddam, R., (2014), Sustainable hub location under mixed uncertainty,
Transportation Research Part E: Logistics and Transportation Review, 62, 89-115.
19. Pishvaee, M.S., Razmi, J., Torabi, S.A., (2014), An accelerated Benders decomposition algorithm for sustainable supply chain network design under uncertainty: A case study of medical needle and syringe supply chain, Transportation Research Part E: Logistics and Transportation Review,
67, 14–38.
20. Torabi, S.A., Rezaei Soufi, H., Sahebjamnia, N., (2014), A new framework for business impact analysis in business continuity management (with a case study),
Safety Science, 68, 309–323.
21. Sheikhalishahi, M., Torabi, S.A., (2014), Maintenance Supplier Selection Considering Life Cycle Costs and Risks: A Fuzzy Goal Programming Approach,
International Journal of Production Research, 52(23), 7084-7099.
22. Ghasemy Yaghin, R., Fatemi Ghomi, S.M.T., Torabi, S.A., (2014), Enhanced joint pricing and lotsizing problem in a two-echelon supply chain with logit demand function,
International Journal of Production Research, 52(17), 4967-4983.
23. Torabi, S. A., Hatefi, S.M.,
Bagheri, P., (2014), Multi-criteria ABC inventory classification with mixed quantitative and qualitative criteria,
International Journal of Production Research, Vol. 52, No. 3, 776–786.
24. Shakhsi-Niaei, M., Iranmanesh, S.H.,
Torabi, S.A., (2014), Optimal planning of oil and gas development projects considering long-term production and transmission.,
Computers and Chemical Engineering, 65, 67–80.
25. Torabi, S.A., Sahebjamnia, N.,
Mansouri, S.A., Aramon Bajestani, M., (2013), A Particle Swarm Optimization for a Fuzzy Multi-objective Unrelated Parallel Machines Scheduling Problem,
Applied Soft Computing, 13, 4750-4762.
26. Torabi, S.A., M. Hamedi, Ashayeri, J., (2013), A New Optimization Approach for Nozzle Selection and Component Allocation in Multi-Head Beam-Type SMD Placement Machines,
Journal of Manufacturing Systems, 32, 700-714.
27. Manzour-al-Ajdad, S.M.H., Torabi, S.A., Pishvaee, M.S., (2013), New heuristic methods for the single-source capacitated multi facility Weber problem.
Int J Adv Manuf Technol, 69, 1569–1579.
28. Ghasemy Yaghin, R., Fatemi Ghomi, S.M.T., Torabi, S.A., ( 2013), A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes,
Fuzzy Sets and Systems,
231, 26-44.
29. Jenabi, M.,
Fatemi Ghomi, S.M.T., Torabi, S.A.,
Hosseinian, S.H., (2013), A Benders decomposition algorithm for a multi-area, multi-stage integrated resource planning in power systems,
Journal of the Operational Research Society,
64: 1118-1136.
30. Shakhsi-Niaei, M., Iranmanesh, S.H.,
Torabi, S.A., (2013), A review of mathematical optimization applications in oil and gas upstream and midstream management,
International Journal of Energy and Statistics 1(2), 143-154.
31. Pishvaee, M.S., Razmi, J., Torabi, S.A., (2012), Robust possibilistic programming for socially responsible supply chain network design: A new approach,
Fuzzy Sets and Systems, 206, 1-20.
32. Ghasemy Yaghin, R., Torabi, S.A., Fatemi Ghomi, S.M.T., (2012), Integrated markdown pricing and aggregate production planningin a two echelon supply chain:A hybrid fuzzy multiple objective approach,
Applied Mathematical Modelling, 36, 6011-6030.
33. Torabi, S.A., Shamekhi Amiri, A.,
(2012), A possibilistic approach for designing hybrid cellular manufacturing systems,
International Journal of Production Research,
50(15), 4090–4104.
34. Torabi, S.A., Moghaddam, M., (2012),
Multi-site integrated production-distribution planning with transshipment: a fuzzy goal programming approach,
International Journal of Production Research,
50(6), 1726–1748.
35. Pishvaee, M.S., Torabi, S.A., (2012), Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty,
Computers & Industrial Engineering, 62, 624–632.
36. Torabi, S. A., Hatefi, S.M., Saleckpay, B., (2012),
ABC inventory classification in the presence of both quantitative and qualitative criteria,
Computers & Industrial Engineering, 63, 530-537.
37. Manzour-al-Ajdad, S.M.H., Torabi, S.A., Salhi, S., (2012), A hierarchical algorithm for the planar single-facility location routing problem.
Computers & Operations Research, 39 (2), 461–470.
38. Manzour-al-Ajdad, S.M.H., Torabi, S.A., Eshghi, K., (2012),
Single-Source Capacitated Multi-Facility Weber Problem—An iterative two phase heuristic algorithm,
Computers & Operations Research, 39 (7), 1465-1476.
39. Torabi, S.A., Rafiei, H., (2012), An optimization framework towards prioritization in fuzzy comparison matrices.
Expert Systems with Applications, 39, 638–646.
40. Lotfi, M.M., Torabi, S.A., (2011), A fuzzy goal programming approach for mid-term assortment planning in supermarkets.
EuropeanJournal of Operational Research, 213, 430-441.
41. Shakhsi-Niaei, M., Torabi, S.A., Iranmanesh, S.H., (2011), A comprehensive framework for project selection problem under uncertainty and real-world constraints.
Computers & Industrial Engineering, 61, 226-237.
42. Pishvaee, M.S., Rabbani, M., Torabi, S.A., ( 2011),
A robust optimization approach to closed-loop supply chain network design under uncertainty,
Applied Mathematical Modelling, 35, 637-649.
43. Torabi, S.A., Ebadian, M., Tanha, R., (2010), Fuzzy hierarchical production planning (with a case study),
Fuzzy Sets and Systems, 161, 1511-1529.
44. Torabi, S.A., Hatefi,
S.M., (2010), A common weight MCDA–DEA approach to construct composite indicators,
Ecological Economics, 70, 114–120.
45. Pishvaee, M.S., Torabi, S.A., ( 2010), A possibilistic programming approach for closed-loop supply chain network design under uncertainty,
Fuzzy Sets and Systems, 161, 2668-2683.
46. Mohammadi, M., Torabi, S.A., Fatemi Ghomi, S.M.T., Karimi,
B., (2010), A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups,
International Journal of Advanced Manufacturing Technology,
49, 201–211.
47. Mohammadi, M., Fatemi Ghomi, S.M.T., Karimi,
B., Torabi, S.A., (2010), MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups,
International Journal of Production Research, 48(10), 2957-2973.
48. Mohammadi, M., Fatemi Ghomi, S.M.T., Karimi,
B., Torabi, S.A., (2010), Rolling-horizon and fix-and-relax heuristics for the multi-product, multi-level capacitated lotsizing problem with sequence-dependent setups,
Journal of Intelligent Manufacturing, 21, 501-510.
49. Torabi, S.A., Hassini, E., (2009), Multi-site production planning integrating procurement and distribution plans in multi-echelon supply chains: An interactive fuzzy goal programming approach,
International Journal of Production Research, 47(19), 5475–5499.
50. Ebadian, M., Rabbani, M., Torabi, S.A., Jolai, F., (2009), Hierarchical production planning and scheduling in make-to-order environments: Reaching short and reliable delivery dates,
International Journal of Production Research, 47(20), 5761-5789.
51. Torabi, S.A., Jenabi, M., (2009), Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain,
International Journal of Advanced Manufacturing Technology,
43, 785-798.
52. Torabi, S.A., Hassini, E., (2008), An interactive multiple objective possibilistic programming approach for the supply chain master planning,
Fuzzy Sets and Systems, 159(2), 193-214.
53. Ebadian, M., Rabbani, M., Jolai, F., Torabi, S.A., (2008), A new decision making structure for order entry stage in make to order environments,
International Journal of Production Economics, 111, 351-367.
54. Rezaie, K., Ostadi, B., Torabi, S.A., (2008), Activity-based costing in flexible manufacturing systems with a case study in a forging industry,
International Journal of Production Research, Vol. 46/4, 1047-1069.
55. Rahimi-Vahed, A.R., Rabbani, Torabi, S.A., (2008), Real options approach for a mixed-model assembly line sequencing problem,
International Journal of Advanced Manufacturing Technology,
37, 1209-1219.
56. Rahimi-Vahed, A.R., Rabbani, M., Tavakkoli-Moghaddam, R., Torabi, S.A., Jolai, F., (2007), A multi-objective scatter search for a mixed-model assembly line sequencing problem,
Advanced Engineering Informatics, 21, , 85-99.
57. Jenabi, M., Fatemi Ghomi, S.M.T., Torabi, S.A., Karimi, B., (2007), Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines,
Applied Mathematics and Computation, 186, 230-245.
58. Torabi, S.A., Fatemi Ghomi, S.M.T., Karimi, B., (2006), A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains,
European Journal of Operational Research, Vol. 173/1, 173-189.
59. Torabi, S.A., Karimi, B., Fatemi Ghomi, S.M.T., (2005), The common cycle economic lot scheduling in flexible job shops: The finite horizon case,
International Journal of Production Economics, 97, 52-65.
Funded research
PhD/master Supervision
Supersivion of 12 PhD students (9 out of 12 have been graduated) and 44 master students (39 out of 44 have been graduated).
Research areas of interest
International academic experiences
Editorial Board
Academic awards
No items yet!
No items yet!